Current Nawat at Egyptian ports
  • Red Sea Next Al-Azraaa (Al-Moakhr) Start 16 April - Duration 13 day ، Spring
  • Mediterranean Sea Next Khamsin to easter Start 23 April - Duration 2 days ، Hot

Studies undertaken by the Division:

  • The design of a multimodal integrated system to be applied on Nuweiba' port (March 1993).
  • The impact of multimodal transport on structures and activities in maritime transport industry (August 1996).