Current Nawat at Egyptian ports
  • Red Sea El-Wasm (El-Awaa) Start 16 October - Duration 13 day ، Autumn
  • Mediterranean Sea El-Saliba Winds Start 20 October - Duration 3 days ، Mostly` without rains

West Port Said port receives marble, iron and petroleum equipment vessels.

 Port Said Ports, affiliated to SC Economic Zone general authority have announced that West Port Said port has witnessed a noticeable activity in general cargo vessels’ traffic, where the port has registered entrance of a vessels coming from Turkey “MOHAMMED” and flying the flag of Togo and of length reaching 100m, draught 7m, width 14m; for unloading 4937 marble ton at the port, “YASEM coming from Alex and flying the flag of Malta, of length reaching 105m, draught 6m, width 16.8m to unload  3237 iron  a ton  port. “EEMSLIFT ELLEN” vessel was also received by the port of length 111m, draught 6m to unload 555 ton petroleum equipment  

 Ongoing is coordination between port’s concerned bodies to facilitate all procedures concerning entrance and departure of vessels to and from the port.  


Achievements