Current Nawat at Egyptian ports
  • Red Sea El-Wasm (El-Awaa) Start 16 October - Duration 13 day ، Autumn
  • Mediterranean Sea El-Saliba Winds Start 20 October - Duration 3 days ، Mostly` without rains

Mameesh: inaugurated projects and bridges 100% Egyptian industry and with international specifications

Vice admiral Mohab Mameesh, head of Suez Canal authority and of Canal economic authority said that all bridges at the canal region inaugurated b y president Sisi has been manufactured in workshops and shipyards of the authority and not a single nail had been imported from abroad. He points out here to the two floating bridges: martyr Ahmed Mansi bridge and Abanob Gerges bridge. Where the first is located at zone number 6 at Ismailia city whereas the second is at Kantara and of length 350km. The importance of the bridge lies in creating a comprehensive integration with the ferries facility and the tunnels under the canal to lighten the burden of the citizen and facilitate transportation from east to west the canal, also providing with required infra- structure for the      new urbanization communities west the canal especially at new Ismailia city, in addition to linking Sinai with rest of Egypt’s governorates. 

 

 Maritime Port Said shipyard has succeeded in employing modern international designs programs and trained cadres from abroad  in designing such floating bridges under a French supervision  to guarantee best application of international standards in safety and maritime security; which the authority  is always committed to; where it oblige all its maritime units  to accredited international authorities’ supervision. Also linking east the canal with its west will participate in increasing Sinai development opportunities to a great extent in the coming period. 

 

 

  Worth noting that all Suez canal tunnels have been implemented by Egyptians “Arab Contactors Company “and in a record time: only one and a half year. This is what engineer/ Mohsen Salah, head of  the company has declared saying that president Sisi gives great concern to  tunnels dredging machines operation process which he has witnessed its success during his visit. This assures that the Egyptian engineer is professional and with his great experience he manages the project without any help from foreigners. He finally assured that the tunnels will be ready for work by 30/6/02018.  


Achievements