Current Nawat at Egyptian ports
  • Red Sea Next Almorbaaniya (El-Eklil) Start 7 December - Duration 13 day ، The beginning of the cold
  • Mediterranean Sea Next Al Faydah Al Saghera Start 19 December - Duration 5 days ، Accompanied with rains
Petroleum Ports
Petroleum Ports

Elzeit East

Elzeit East

Time Zone GMT +2

 

Coordinate

Long 33 o 35.9 \ E
Lat 27 o 50.92 \ N

 

Data Port

Total Area 7000 m2 (berth area only)
Port Establishment Decree 8 / 1981.
Port License Decree 503 / 2002.
Port License Duration 1/10/2002– 30/9/2012 (renewable).
Port Activity Receiving, shipping and discharging petroleum tankers.

Port Characteristics

Maritime Surface 4 Km2 (4000 m2)
Port capacity (vessels) 3 Carriers / Month reaching to tonnage 100000 tons and dept 14.5 m

 

Port Description and Constituents

Buoys SPM for the reception of tankers with tonnage reaching 130-250 thousand tons and 32 m depth.
Berth (petroleum marine) Services berth with 65 m length and 6 m depth equipped for the reception of tugs, mooring crafts and services crafts.

 

Port Services and Facilities

Services and facilities

All preventive measures against fire, pollution of hazardous substances and navigational services are available (Fresh water , electricity ,sewage,and fuel station).

facilities

Reception facilities and waste treatment unit for oil service vessels.

Contacts

Administration Public Egyptian Petroleum Authority
Address Palestine st. - 4th district – Maadi – Cairo.
Phone (02)25291502 , 0101614365
Fax (02) 7065030

Source: Central Department of specialized Ports and Marine Environment